Intelligent PDU, switched (Base version), Zero-U, 1 phase 32A, 21 C13 outlets + 3 C19 outlets, with cord locking
Intelligent PDU, switched (Node version), Zero-U, 1 phase 32A, 21 C13 outlets + 3 C19 outlets, with cord locking
Intelligent PDU, switched (Base version), Zero-U, 3 phase 16A, 21 C13 outlets + 3 C19 outlets, with cord locking
Node controller for Linkeo Data Center PDU
PDU, Zero-U, 1 phase 16A, 18 C13 outlets + 6 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 16A, 20 C13 outlets + 4 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 32A, 20 C13 outlets + 4 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 32A, 12 C13 outlets + 12 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 16A, 21 C13 outlets + 3 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 16A, 24 C13 outlets + 6 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 32A, with local power meter, 20 C13 outlets + 4 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 16A, with local power meter, 36 C13 outlets + 6 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 32A, 24 High Density C13 outlets + 12 C19 outlets, with cord locking
PDU, Zero-U, 1 phase 32A, 36 High Density C13 outlets + 6 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 32A, 24 High Density C13 outlets + 12 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 32A, 36 High Density C13 outlets + 12 C19 outlets, with cord locking
PDU, Zero-U, 3 phase 32A, 36 High Density C13 outlets + 6 C19 outlets, with cord locking
Copper cables guide accessory
Self-locking cable ties - 16 x 150 mm - tightening max. Ø 35 mm - green
Self-locking cable ties - 16 x 300 mm - tightening max. Ø 80 mm - black
Self-locking cable ties - 16 x 300 mm - tightening max. Ø 80 mm - red
Self-locking cable ties - 16 x 300 mm - tightening max. Ø 80 mm - green
Cable tie - VDI application - L. 180 mm - Ø15 to 35 mm - tightening indicator
Cable tie - VDI application - L. 225 mm - Ø35 to 50 mm - tightening indicator